STU_3224

Automotive Process Water Test System Integration

PR Automation Ltd were commissioned to design and deliver the control system for a process water test to be employed in the automotive industry by one of the UK’s leading automotive process equipment manufacturers. The solution was based on a distributed I/O configuration accommodated by an Ethernet architecture, encompassing energy saving and maintenance friendly functionality, complete with a directive to achieve a cycle time of 50 UPH. The total system was conceptualised, designed, installed and commissioned into a new vehicle phased production program within 40 weeks.

PRA Delivered:-

  • Controls Design
  • Software Design
  • Virtual Validation (Emulation)
  • Panel Build
  • Controls Installation
  • Design Validation & Commissioning
Back